Draining the water in the Bowatenna Reservoir commences today (24), Engineer in charge of the reservoir Buddhika Navaratne says.
Studying the silt and sand accumulated in the reservoir after 50 years since starting the Bowatenna Reservoir, removing them, and cleaning will be carried out here.
Removing silt in the Kala Wewa water supply where water is released from the reservoir is also scheduled to be carried out.
However, the engineer in charge of the reservoir stated that this will not cause a disruption to the water supply to downstream catchment areas.
Latest News
ampath Bank appoints Dilip de S Wijeyeratne as Deputy Chairman
Local
11 September 2026
MAN TV-produced ‘The Motherland’ takes Lankan stories to global audiences
Local
11 September 2026
“Market declines as retail investors remain on the sidelines”
Local
10 September 2026
Trump offers $5,000 to every adult if GOP wins midterms
Local
10 September 2026
Oil prices surge as Middle East tensions threaten supply
Local
10 September 2026
Modernised Bambalapitiya Railway Station opened
Local
10 September 2026
Pharmacy owner remanded over illegal sale of prescription drugs
Local
10 September 2026
Families of deceased migrant workers to receive Rs. 2m
Local
10 September 2026
Namal alleges massive coal shortage worth Rs. 4.62bn
Local
10 September 2026
Sri Lanka, BIMSTEC to sign technology transfer pact in Colombo
Local
10 September 2026