Hungarian authorities will sink two barges in the Danube on Saturday to raise the water level at the Paks nuclear plant to avert a shutdown of one of its last two remaining turbines, as water levels are dropping, Prime Minister Peter Magyar said.
The plant currently operates at around 25% of its capacity due to a historic drought and record low water levels on the Danube river, from which the nuclear plant draws its coolant.
Magyar said in a Facebook post that current forecasts indicated the water level would drop to the critical level by early Monday morning at which point one of the two operating turbines would have to be shut down.
"The Danube is receding...The controlled sinking of the barges will begin shortly," he said.
Hungary's government said on Wednesday that it would build a riverbed "sill", a submerged, dam-like structure built crosswise on the bottom of a river channel, to manage water flow. That will take weeks.
It also said that two 80-metre (260-foot) barges would be submerged near the nuclear plant to raise the water level in the short term so that the plant's two turbines could continue working while the riverbed sill was under construction.
Neighbouring Romania shut down its last working reactor on Thursday due to the low level of the Danube. The drought also raised questions in Hungary and Romania about how to adapt atomic energy to an increasingly extreme climate.
-Reuters
The plant currently operates at around 25% of its capacity due to a historic drought and record low water levels on the Danube river, from which the nuclear plant draws its coolant.
Magyar said in a Facebook post that current forecasts indicated the water level would drop to the critical level by early Monday morning at which point one of the two operating turbines would have to be shut down.
"The Danube is receding...The controlled sinking of the barges will begin shortly," he said.
Hungary's government said on Wednesday that it would build a riverbed "sill", a submerged, dam-like structure built crosswise on the bottom of a river channel, to manage water flow. That will take weeks.
It also said that two 80-metre (260-foot) barges would be submerged near the nuclear plant to raise the water level in the short term so that the plant's two turbines could continue working while the riverbed sill was under construction.
Neighbouring Romania shut down its last working reactor on Thursday due to the low level of the Danube. The drought also raised questions in Hungary and Romania about how to adapt atomic energy to an increasingly extreme climate.
-Reuters
Latest News
Nations Trust Bank records PAT of LKR 15.6Bn
Local
16 August 2026
Softlogic Life delivers largest absolute GWP growth of Rs. 7.2 Bn
Local
16 August 2026
Porsche's Wehrlein claims second Formula E title as Barnard wins London finale
Local
16 August 2026
Bangladesh says better environment needed for India visit amid rift over ousted leader
Local
16 August 2026
Malaysian pilot nabbed in Indonesia believed to have smuggled drugs abroad since 2024
Local
16 August 2026
Trump's envoys meet mediators, Israel strikes Gaza
Local
16 August 2026
Emergency phone alert put domestic abuse victims at risk, campaigners say
Local
16 August 2026
Storm Lala leaves more than 100,000 without power
Local
16 August 2026
Arsenal rout Manchester City in Community Shield masterclass
Local
16 August 2026
In Spain's Ceuta, hundreds of migrants stage protest and demand asylum
Local
16 August 2026